All projects
InfrastructureCosta Brava Area, Southern Beirut, Lebanon
Design of Costa Brava Composting Plant

HydroTech led the concept study and preliminary design of a 750 ton-per-day composting plant in the Costa Brava area, built on modern bio-drying tunnel technology with scrubbing and biofiltration systems and a refining plant for compost polishing and future RDF production.
Client / funder: Costa Brava Composting Plant
Services Delivered
- Concept Study & Preliminary Design (Bio-Drying Tunnel Technology)
- Tender Document Preparation
- Technical & Financial Bid Evaluation




