All projects
InfrastructureAqaba, Jordan

Reinforced Concrete Bridge, Aqaba Oil Terminal

Reinforced Concrete Bridge, Aqaba Oil Terminal

Design services for an 80 m long, 20.80 m wide reinforced concrete girder bridge to replace the existing structure near the Aqaba Oil Terminal.

Services Delivered

  • Structural Design of the Bridge
  • Geometric Design of Connections with Existing Road
  • Hydrological Study
  • Topographical Survey
  • Geotechnical Investigation & Protection Works